Monday, June 28, 2010

Three Car Garage in St. Augustine

Thanks to Mr. & Mrs. Tom H. in for choosing Rhino Pro Floors to fix the garage floor problems inherent in buying a model home.  The builder had used the garage for offices, and after removing the carpet and temporary walls, there was much work to be done.  The end result speaks for itself!

See more and larger photos on our Facebook Page.

PHOTO LINK

House  right beforeright groundrightleft before left ground  left doneLong Viewlong view ground left  Front    SDC11907

Monday, June 7, 2010

T’s Learning Center underway

We were able to complete three classrooms at the new T’s on Monument Road.  Below are some of the pictures.  The lighting is terrible, I’ll post better pictures when the place is cleaned up a bit and has electricity!

SDC11856

First this crack had to be fixed!

SDC11861

Fixed!

 

SDC11872 SDC11874 SDC11875 SDC11876 SDC11877

Tuesday, June 1, 2010

Nav-Air Offices now Flight Ready!

Nav-Air on Naval Station Mayport had two offices in dire need of some attention.  They were both tiled (horribly).  The tiles were cracked, impossible to keep clean and, in many places, no longer stuck to the concrete, creating a trip hazard.

Rhino Pro Floors was contacted to remove the old floor, and give them a seamless, easy to maintain and good looking floor.  Sandstone chips of a beige base was the color of choice.

See larger pictures on our Facebook page.

PICTURE LINK

SDC11818 SDC11819 SDC11820 SDC11821 SDC11822 SDC11823 SDC11824   large floor 2 donelarge floor 1 donesmall floor donecolor close up